The Control Panel - Part 2

The last update of the day. The routering has been completed using a smaller bit and anything too small to be cut with that bit was carefully chiselled away. The chiselling took under 2 hours in total, and I had quite forgotten how calming it is. Sort of a laborious but rewarding thing - much like most of railway modelling!


Above: After the smaller router bit, but before the chiselling!


Above: Freda comes to inspect my handiwork! All as approved luckily.


Above: The control panel loosely held up roughly where it will be fitted. Note the extension for the fiddle yard was detached in this shot.


Above: An aerial view for size comparison with 009 track and OO track visible.

So far, so good! A little bit more sanding down, some polyfilla and a bit of paint and we should be almost there. Oh, and I ought to build a frame for it to sit on, too!

Comments